Stop Transformer Oil Leakages~Live
Sealing of active leakages – under – pressure – without draining or isolation of line.
No Shut-down.
Zero down-time
Prevents loss of costly oil & enhance transformer
efficiency.
Instantly arrests leakage of Oil, Water, Gas, Chemicals etc.,
Leakage gets stopped just in few minutes
Per RMTR - Rs.8000.00
MOQ - 5 RMTR
Bolts and threaded
Connections
Flange gasket failures
Top cover / bottom cover of transformer lids

Bushing leak

On-line Tap Changer
Weld seams
Radiator fins
  • Zero-Down-Time ETP
  • Instantly Stops Oil & Gas leakages
  • Zero-Down-Time ETS
  • Stick form of Express Titanium Putty
  • SavesPast SP
  • Seal coat of Zero-Down-Time FTP and Temp Resistant
  • RTV Silicon Clear
  • For Seal the Bolt and Threaded portion leakages.
  • SavesPast ACR
  • For cleaning of surfaces
  • EazyMaintenance OLS
  • For clean the Oily Surfaces quickely and make the Surface Dry from Oil
Tensile Strength, Kg/cm - 105
Compressive Strength, Kg/cm - 582
Hardness, Shore D - 80
Mixing Ratio by weight - R1 : H1
Pot life at 30 C, minutes - 3
Please Visit : www.monarchindia.net www.monarchexports.com
Monarch Industrial Products (I) Pvt Ltd
Post Box No : 3 No : 25 SIDCO Industrial Estates
THENI - 625531. Tamilnadu State, India.
Telephone : 91-4546 251020, 250076
Fax : 91-4546253060 Mobile : 91-9600992033

Email Us : uplap@monarchindia.net
  • Delhi Transco Limited
  • Uttarakhand Jal Vidyut Nigam Limited
  • Tamil Nadu Electricity Board
  • Domodar Velley Corporation
  • Bokaro Power Supply Coroporation
     Our Valuable Clients